Scheduled Changes¶
ZoneControl stores changes that need to happen at a certain time as a Scheduled Change.
A scheduled change as shown in the interface can be seen in Fig. 2.
![Finished scheduled change in the admin panel](../../_images/admin-scheduled-changes-finished.png)
Fig. 2 Finished scheduled change in the admin interface¶
When a staff-user is allowed by any of its roles to access the Scheduled Change and the change has not occured yet, these fields can be edited in the administrative interface:
Zone
RR name
Type
TTL
RR records
API server
Scheduled at